Operational ProcedureReturn to “Manual Steps” prior to reloading
- The slide gate is removed and ...
- The cake is then removed with a skid steer loader with bucket protection
- Once the cake is removed from the bed, the bed is washed down with high pressure spray into a receiving drain.
- The gate is then replaced and the bed is ready for another load.